After a long journey, two 1.3343 ESR ingots reached to Better’s warehouse from about 1000km away - -!
Finally become two machined high speed steel 1.3343 flats like this :
Ended more than 4 month waiting, they just delivered with other smaller “friends”.
We are keep on trying to make some more bigger size. The next target is 3 tons to 5 tons ESR ingots, to produce 250mm -350mm x 400-600mm.
HSBIT, challenge on the way.